UV components 1/2: electric motor, pump, conveyor module and piston (Assembly Line, 30 s, 122 880 EU/t, research 32 CWU/t, 576 mB naquadria each)¶
Chain id: uv_components · Tags: Infinite source, Unverified
Era setup: UV · Abydos
Plan modules: UV components and hatches
Tips: 6, 1 unverified
Machines¶
Assembly Line · 30 s · 122 880 EU/tMultiblock
Oak 11 long magnetic dysprosium rod · 4 long tritan steel rod · 4 tritan steel ring · 8 tritan steel round · 64 fine americium wire · 2 YBCO cable · 576 mB solder · 1000 mB lubricant · 576 mB naquadriaLong magnetic dysprosium rodLong tritan steel rodTritan steel ringTritan steel roundFine americium wireYBCO cableNaquadria1
30 s
UV Electric Motor1
gtceu:assembly_lineAssembly Line · 30 s · 122 880 EU/tMultiblock
Oak 11 motor · naquadah pipe · 2 tritan steel plate · 8 screw · 8 SBR ring · pure netherite rotor · 2 YBCO cable + fluidsNaquadah normal fluid pipeTritan steel plateTritan steel screwSBR ringPure netherite rotor1
30 s
UV Electric Pump1
gtceu:assembly_lineAssembly Line · 30 s · 122 880 EU/tMultiblock
Oak 12 motor · 2 plate · 4 ring · 16 round · 4 screw · 2 YBCO cable · 3456 mB SBR + fluidsStyrene butadiene rubber1
30 s
UV Conveyor Module1
gtceu:assembly_lineAssembly Line · 30 s · 122 880 EU/tMultiblock
Oak 11 motor · 4 plate · 4 ring · 16 round · 4 rod · pure netherite gear · 2 small netherite gear · 2 YBCO cable + fluidsPure netherite gearSmall pure netherite gearTritan steel rod1
30 s
UV Electric Piston1
gtceu:assembly_lineFlow¶
- Assembly Line · 30 s · 122 880 EU/t → Assembly Line · 30 s · 122 880 EU/t (also Assembly Line · 30 s · 122 880 EU/t → Assembly Line · 30 s · 122 880 EU/t, Assembly Line · 30 s · 122 880 EU/t → Assembly Line · 30 s · 122 880 EU/t)
- Assembly Line · 30 s · 122 880 EU/t
- Assembly Line · 30 s · 122 880 EU/t
Direct steps¶
- UV Electric Motor → 1 motor · naquadah pipe · 2 tritan steel plate · 8 screw · 8 SBR ring · pure netherite rotor · 2 YBCO cable + fluids (1)
- UV Electric Motor → 2 motor · 2 plate · 4 ring · 16 round · 4 screw · 2 YBCO cable · 3456 mB SBR + fluids (2)
- UV Electric Motor → 1 motor · 4 plate · 4 ring · 16 round · 4 rod · pure netherite gear · 2 small netherite gear · 2 YBCO cable + fluids (1)
How to build¶
- Drawers first, one per input: long magnetic dysprosium rods, long rods, rings, rounds, plates, screws, rods, fine americium wire, YBCO cables, naquadah pipes, SBR rings, pure netherite rotors / gears / small gears, motors. Drums: ITLC solder, lubricant, naquadria, SBR. One Assembly Line per product, each with its own Data Access Hatch loaded with the matching research orb. —
functionalstorage:oak_1,gtceu:tritan_steel_ring,gtceu:fine_americium_wire,gtceu:pure_netherite_rotor - Research each ZPM item once: orb + ZPM motor in the Object Holder, 32 CWU/t at 122 880 EU/t; repeat for the pump, conveyor and piston. Orbs into the matching Assembly Line’s hatch (or a Data Bank). —
gtceu:research_station,gtceu:zpm_electric_motor,gtceu:data_orb - Motor line first: buses in recipe order (rod, long rods, rings, rounds, fine wire, cables), fluids by hatches. 30 s each; output drawer Keep Exact 8: every other component eats motors. —
gtceu:assembly_line,gtceu:uv_electric_motor - Pump and conveyor lines: motors by router from the drawer (1 and 2), their own parts by routers; conveyor also needs 3456 mB SBR on its own fluid hatch. —
gtceu:assembly_line,gtceu:uv_electric_pump,gtceu:uv_conveyor_module - Piston line: motor + plates + rings + rounds + rods + the pure netherite gear and two small gears. All four share the naquadria drum through Pipez pipes with valves. —
gtceu:assembly_line,gtceu:uv_electric_piston - Output drawers Keep Exact 4: motors 8. Machines, hatches and every UV multiblock take them from here. —
functionalstorage:oak_1,gtceu:uv_electric_motor
Tips¶
- Source: kjs additions/progression/components/luv_to_uv_components.js with the UV values of utils/tier_data.js (verified): tritan steel (primary), pure netherite (secondary: rotor, gears), americium fine wire, YBCO cables, naquadah pipes, dysprosium magnets, SBR rubber, solder = indium tin lead cadmium soldering alloy, scaler 3 (fluids x 8). Every UV component is an Assembly Line recipe, 600 ticks (30 s), at VA[ZPM] = 122 880 EU/t, plus 576 mB MOLTEN NAQUADRIA (tier fluid, UV only), and a scanner-free STATION research of the ZPM version of the item at 32 CWU/t (122 880 EU/t) for motor, pump, conveyor, piston and robot arm; emitter, sensor and field generator need 48 CWU/t at 491 520 EU/t. The scanner recipes are removed.
- Motor: 1 long magnetic dysprosium rod, 4 long tritan steel rods, 4 tritan steel rings, 8 tritan steel rounds, 64 fine americium wire (8 ingots), 2 YBCO single cables; fluids 576 mB solder, 1000 mB lubricant, 576 mB naquadria. Pump: 1 UV motor, 1 naquadah normal fluid pipe, 2 tritan steel plates, 8 tritan steel screws, 8 SBR rings, 1 pure netherite rotor, 2 YBCO cables; same fluids. Conveyor: 2 UV motors, 2 plates, 4 rings, 16 rounds, 4 screws, 2 cables; same fluids + 3456 mB styrene butadiene rubber. Piston: 1 UV motor, 4 plates, 4 rings, 16 rounds, 4 rods, 1 pure netherite gear, 2 small pure netherite gears, 2 cables; same fluids.
- Alternatives with the same inputs: the Component Nexus (UHV multiblock, 300 ticks = half the time, stabilized cleanroom) and the Component Synthesis Forge (64 items per run from 48 times the inputs, needs a research of 320 CWU/t and a component data core; component_part_synthesis for the SMDs). Both are UHV-era; the Assembly Line is the UV way.
- Cost (ingot equivalents): motor = 8 americium ingots + about 6 tritan steel ingots + 2 YBCO cables; pump adds 1 motor + a pure netherite rotor; conveyor is 2 motors; piston 1 motor. Americium comes from fusion (uv_fusion_mats), pure netherite from the netherite line (nether lines; Unverified route), tritan steel from the ABS (uv_alloys). A single machine of a tier needs 2 motors, 1 pump, 1 conveyor or so: the americium bill alone makes the UV machines a fusion-reactor project.
- Sub-steps people skip: (1) naquadria is a FLUID input 576 mB on every recipe (it is also the neutronium feed); (2) one dedicated Assembly Line per product, motors made first and kept in a drawer Keep Exact 4 (the pump needs 1, conveyor 2, piston 1, every other component 1 to 2); (3) the four research items (ZPM motor, pump, conveyor, piston) are scanned in the Research Station: keep one ZPM version of each; (4) a second pair of Data Access Hatches or one Data Bank stores the orbs.
- Unverified pure netherite and dysprosium sources; whether the Assembly Line at 122 880 EU/t needs a ZPM hatch exactly (a ZPM energy hatch runs it).
Bill of materials¶
| Item | Qty |
|---|---|
gtceu:assembly_line |
4 |
gtceu:research_station |
1 |
gtceu:data_bank |
1 |
gtceu:zpm_energy_input_hatch |
2 |
functionalstorage:oak_1 |
26 |
modularrouters:modular_router |
14 |
gtceu:lv_robot_arm |
14 |
gtceu:item_filter |
20 |
pipez:item_pipe |
16 |
pipez:fluid_pipe |
6 |
gtceu:steel_drum |
8 |
Needs / Feeds¶
- Main source for:
gtceu:uv_electric_motor,gtceu:uv_electric_pump,gtceu:uv_conveyor_module,gtceu:uv_electric_piston,gtceu:fine_americium_wire